Safety focused
The important consideration in every aspect of our operations.
Considering of Industries growth in Bangladesh, I-Mart Engineering PLC. started rendering service in 2011 to meet up increasing demand for pre-Engineered steel buildings.
I-Mart Engineering PLC. comes with epoch-making changes in the field of designing pre-engineered steel buildings confirming the uses of standard construction codes and modern technologies instead of traditional methods.
I-Mart Engineering PLC. has a continuous process for innovation and vision for procuring the best technologies and expertise in engineering solutions with intention of providing the best customer service ensuring a successful steel building projects for customers.
Add more content as needed in this larger column.
I-Mart Engineering PLC. has its own R&D which always concern in innovating new concepts, methods, of designing and manufacturing.
Customer satisfaction, trouble-free construction, on-time delivery, an accurate fit of components are the priorities of Steelinfra that has enhanced.
We are committed to strive to meet all building challenges using environmentally sound methods and materials. Additionally, the I-Mart Engineering PLC. beliefs on sustainability have led to a company policy that emphasizes environment preservation. I-Mart Engineering PLC. work on projects that include experiencing green cover, reducing effluents and emission, maintaining local ecological and improving long term coronate sustainability
I-Mart Engineering PLC. recognizes higher priority client satisfaction and maintains standard services with quality steel construction services that will build long-lasting relationships with clients.
To continuously find ways to improve overall industry performance and a high level of integrity and open communication in all our relationships.
Premium quality and performance resulting from our expertise, efficiency, attention to detail and passion.
Value based on the depth of our financial resources, our local knowledge, and our technical expertise.
Strong, enduring relationships with clients and partners based on trust, transparency, and results.
The important consideration in every aspect of our operations.
Name of the Company |
I-Mart Engineering PLC. |
Type of Company | Public Limited Company |
Certificate of Incorporation | C-95404/2011 |
Trade License No. | 05-52922 |
Environmental Certificate No. | 22.02.5600.141.71.226.17.37 |
Fire License No. | AD/Dhaka 31129/15 |
Department of Inspection for Factories & Establishment | 17193/Manikgonj |
VAT Registration Number (BIN) | 000114561-0404 |
TIN No | 284737747623 |
Industrial IRC | BA-161500 |
Dhaka Chamber of Commerce Serial No. | 05085 |
BEPZA | EOCHA015 |
BIDA Registration No. | L-44071706017-H |
Commercial Production | 2011 |
Land area of Factory Premises | 36,000 sft (Presently) 180,0000 sft (Under Development) |
Production Capacity | 12,000 MT/Year |
Manpower | 155 Persons |
Bankers |
|
Properties | Pre-Engineered Steel Building | Conventional Steel Building |
---|---|---|
Structural Weight | Pre-engineered buildings are on the average 30% lighter because of the efficient use of steel. Secondary members are light weight roll formed "Z" or "C" shaped members. | Primary steel members are selected hot rolled "T" sections. Which are, in many segments of the members heavier than what is actually required by design. Secondary members are selected from standard hot rolled sections which are much heavier. |
Design | Quick and efficient design since PEB's are mainly formed by standard sections and connections design, time is significantly reduced. | Each conventional steel structure is designed from scratch with fewer design aids available to the engineer. |
Construction Period | Average 6 to 8 weeks | Average 20 to 26 weeks |
Foundation | Simple design, easy to construct and light weight. | Extensive, heavy foundation required. |
Erection and Simplicity | Since the connection of compounds is standard the learning curve of erection for each subsequent project is faster. | The connections are normally complicated and differ from project-to-project resulting in increasing the time for erection of the buildings. |
Erection Time and Cost | The erection process is faster and much easier with very less requirement for equipment | Typically, conventional steel buildings are 20% more expensive than PEB in most of the cases, the erection costs and time are not estimated accurately. Erection process is slow and extensive field labor is required. Heavy equipment is also needed. |
Seismic Resistance | The low weight flexible frames offer higher resistance to seismic forces. | Rigid heavy frames do not perform well in seismic zones. |
Overall Cost | Price per square meter may be as low as by 30% than the conventional building. | Higher price per square meter. |
Architecture | Outstanding architectural design can be achieved at low cost using standard architectural details and interfaces. | Special architectural design and features must be developed for each project which often requires research and thus resulting in higher cost. |
Future Expansion | Future expansion is very easy and simple. | Future expansion is most tedious and more costly. |
Safety and Responsibility | Single source of responsibility is there because the entire job is being done by one supplier. | Multiple responsibilities can result in question of who is responsible when the components do not fit in properly, insufficient material is supplied or parts fail to perform particularly at the supplier/contractor interface. |
Performance | All components have been specified and designed specially to act together as a system for maximum efficiency, precise fit and peak performance in the field. | Components are custom designed for a specific application on a specific job. Design and detailing errors are possible when assembling the diverse components into unique buildings. |
1. Reduction in Construction Time
Buildings are typically delivered in just a few weeks after approval of drawings. Foundation and anchor bolts are cast parallel with finished, ready for the site bolting. In India, the use of PEB will reduce the total construction time of the project by at least 50%. This also allows for faster occupancy and earlier realization of revenue.
2. Lower Cost
Due to the systems approach, there is a significant saving in design, manufacturing and on-site erection cost. The secondary members and cladding nest together reducing transportation cost.
3. Flexibility of Expansion
Buildings can be easily expanded in length by adding additional bays. Also, expansion in width and height is possible by pre-designing for future expansion.
4. Larger Spans
Buildings can be supplied to around 80M clear spans.
5. Quality Control
As buildings are manufactured completely in the factory under controlled conditions the quality is assured.
6. Low Maintenance
Buildings are supplied with high-quality paint systems for cladding and steel to suit ambient conditions at the site, which results in long durability and low maintenance costs.
7. Energy-Efficient Roofing and Wall Systems
Buildings can be supplied with polyurethane insulated panels or fiberglass blankets insulation to achieve required "U" values.
8. Architectural Versatility
The building can be supplied with various types of fascia's, canopies, and curved eaves and are designed to receive precast concrete wall panels, curtain walls, block walls and other wall systems.
9. Single Source Availability
As the complete building package is supplied by a single vendor, compatibility of all the building components and accessories is assured. This is one of the major benefits of pre-engineered building systems.